How to Vet an ADU Builder: A Homeowner's Checklist

You have done the initial research and have two or three ADU contractors who cleared the basic license check. Now comes the harder part: figuring out which one is actually right for your project.

This guide covers the evaluation phase — what to review, what to ask, and what to scrutinize before you sign anything. If you are still identifying candidates, the guide on finding a qualified ADU contractor covers that earlier step.

Important: This guide is for general informational purposes only and is not legal, contracting, insurance, or financial advice. Requirements and standard practices vary by project, contractor, and jurisdiction. Consult qualified professionals before making hiring or contracting decisions.

Last updated: June 2026. Sources reviewed: June 2026.

Short Answer

Before hiring an ADU builder, review their completed ADU project portfolio, call at least two past clients from similar project types, verify current insurance certificates directly, compare bids line by line across identical scope, and read every clause in the contract before signing. This process takes a few hours and can save months of problems.

Review Their Completed ADU Portfolio

A portfolio tells you more than a license number. Ask each contractor for photos or a site visit to at least two completed ADU projects from the past two years.

What to look for:

Project type match: If you are building a detached ADU, look for completed detached ADU projects — not just garage conversions. The structural work, permitting path, and utility connections differ meaningfully between project types.

Quality of finishes: Tile work, trim, cabinetry, and fixtures reveal craftsmanship. Basic finishes done carefully signal attention to detail across the whole project.

Permit history: Ask whether each project was fully permitted and passed final inspection without major corrections. A contractor who gets clean plan check approvals saves you time and money.

Some contractors maintain a portfolio on their website. Others can provide photos or addresses of recent projects. If a contractor cannot show you any completed ADU work specifically, that is a data point worth weighing.

Call Their References — With a Script

Online reviews matter, but a direct reference call gives you information you cannot find anywhere else. Ask for two or three clients from completed ADU projects, ideally within the past 18 months.

When you call, ask these questions:

  1. 1

    Did the project finish on time, and if not, what caused the delay?

  2. 2

    Did the final cost match the original bid, or were there significant change orders?

  3. 3

    Did the contractor pull permits without problems, and did the work pass inspections the first time?

  4. 4

    Was communication consistent — or did you have to chase them for updates?

  5. 5

    Would you hire them again?

The last question tends to produce the most honest answer. A satisfied client says yes without hesitation. A client who had serious problems will often hedge or give a qualified response — which is worth following up on.

Verify Insurance Directly

Do not accept a verbal confirmation that a contractor is insured. Ask for a current certificate of insurance that shows:

General liability insurance: Covers property damage or injury during construction. For ADU projects, a minimum of $1 million per occurrence is standard in California.

Workers' compensation insurance: Required in California for any contractor with employees. Without it, you may be liable if a worker is injured on your property during the project.

The certificate should list your property address and show a current expiration date. If the policy lapses mid-project, your coverage gap becomes your problem.

You can also verify on cslb.ca.gov whether a contractor has a workers' compensation exemption on file (applicable to sole proprietors with no employees). This is separate from the license check and takes only a moment.

Note: Insurance requirements can vary by project scope and contract structure. Consult a qualified insurance professional to understand your specific liability exposure before construction begins.

Compare Bids Line by Line

Getting multiple bids is standard advice. Comparing them correctly is less common. Before looking at totals, confirm that each bid covers the same scope of work.

Ask each contractor to break their bid into these categories:

Design and plan preparation (if included)

Permit fees and city processing fees

Site preparation and demolition

Foundation or slab work

Framing, roofing, and exterior

Electrical, plumbing, and HVAC

Insulation and drywall

Interior finishes (kitchen, bath, flooring)

Contingency allowance

A bid that is $30,000 lower may simply be missing line items the other contractors included. Once you align scope, the comparison becomes genuinely useful. The San Diego ADU cost guide provides reference ranges for each cost category if you want a benchmark.

Watch for the contingency line. An honest contractor includes a contingency — typically 10–15% of hard construction costs — to account for conditions found once walls open or footings are dug. A bid with no contingency is either incomplete or unrealistically optimistic.

Read the Contract Before Signing

The contract is your protection if anything goes wrong. A one-page agreement for a six-figure ADU project is not adequate. A proper ADU contract should include:

Scope of work: Specific materials called out by type, brand, or grade — not vague language like 'standard finishes.'

Payment schedule tied to milestones: Payments should be triggered by completed construction stages, not calendar dates. This protects you if the project stalls.

Change order process: All scope or cost changes must be in writing before work proceeds, with cost and timeline impact documented. Verbal change orders are not binding.

Permit responsibility: Specifies who pulls each permit and who pays for plan check resubmittals if corrections are required.

Lien waiver provisions: Requires the general contractor to provide documented proof that subcontractors and suppliers have been paid before each payment milestone. This protects you from mechanics liens filed by subs the GC fails to pay.

Warranty terms: Specifies the duration and coverage of the contractor's warranty on labor and materials.

Termination clause: Defines what happens if the project stalls significantly or either party needs to exit the agreement.

California law requirement: California Business and Professions Code Section 7159 sets mandatory elements for home improvement contracts, including a cooling-off period for contracts signed away from the contractor's place of business. Any contract worth signing will already meet these requirements. One that does not is a red flag.

Homeowner Vetting Checklist

Before signing a contract with any ADU builder:

Reviewed portfolio of completed ADU projects matching your project type

Called at least two past ADU clients directly using the reference script

Received and verified a current certificate of insurance (general liability + workers' comp)

Confirmed active license on cslb.ca.gov with correct class and no open complaints

Received at least three itemized bids covering identical scope

Compared bids line by line — not just the total

Confirmed each bid includes a contingency line item (10–15% of hard costs)

Read the full contract: scope, payment milestones, change order process, lien waivers

Confirmed the contractor pulls all required permits in their own name

Verified the contractor is current on California ADU laws since 2020

Final Thoughts

Vetting a contractor properly takes a few hours spread across a few days. Most homeowners who skip this process do so because they feel pressure to decide quickly. That pressure often comes from the contractor — which is itself worth noticing.

A contractor who clears a thorough vetting process is far more likely to deliver a project that finishes close to the original budget, passes inspections cleanly, and holds up over time.

To compare ADU builders in San Diego by project type and service area, browse the San Diego ADU builder directory, or get matched with qualified ADU professionals based on your specific project and location. For guidance on the permit side of the project, the San Diego ADU permit guide explains what to expect from plan check to final inspection.

Frequently Asked Questions

How is vetting different from finding a contractor?+
Finding a contractor means locating qualified candidates through directories, referrals, or search. Vetting means evaluating specific candidates once you have them — covering portfolio review, reference calls, insurance verification, bid comparison, and contract review.
How many references should I call before hiring an ADU builder?+
Call at least two, ideally from projects similar to yours in type and scope. One reference can be an outlier. Two or more give you a pattern to evaluate.
What should I do if a contractor refuses to provide references?+
Treat it as a significant concern. Experienced contractors with satisfied clients expect reference requests and accommodate them readily. Repeated refusal or deflection suggests either limited ADU experience or past client problems worth investigating.
Is it normal for ADU contractor bids to vary widely?+
Yes. Wide variation usually reflects differences in scope coverage, materials specifications, subcontractor relationships, or each contractor's understanding of your specific site. A low bid is not automatically a better deal — confirm that all bids cover the same scope before comparing totals.
What is a mechanics lien and why does it matter for ADU projects?+
A mechanics lien is a legal claim that a subcontractor or materials supplier can place on your property if the general contractor fails to pay them — even if you paid the GC in full. Lien waiver provisions in your contract require the GC to document that subcontractors and suppliers have been paid before each payment milestone.
Can I negotiate the contract terms with an ADU builder?+
Yes, and experienced contractors expect it. Items worth discussing include the payment milestone structure, what triggers a change order, the contingency percentage, and which specific materials or finishes are included in the base scope.

Disclaimer: This article is for informational purposes only and does not constitute legal, zoning, permitting, contracting, insurance, financial, engineering, or construction advice. Requirements vary by property, city, and project type. Consult a licensed professional before making decisions about your ADU project.

Sources and Official Resources

  • California Contractors State License Board — Verify a Licensecslb.ca.gov. Accessed June 2026.
  • California Contractors State License Board — Workers' Compensation Insurance Requirementscslb.ca.gov. Accessed June 2026.
  • California Business and Professions Code Section 7159 — Home Improvement Contractsleginfo.legislature.ca.gov. Accessed June 2026.
  • California Department of Housing and Community Development — Accessory Dwelling Unitshcd.ca.gov/policy-research/accessory-dwelling-units. Accessed June 2026.

California contractor licensing and insurance requirements can change. Verify current requirements with the Contractors State License Board and consult qualified professionals before hiring.